Frequently asked questions
How much does an app redesign cost?
Our published prices are £12,000 for the Blueprint, £30,000 for Blueprint plus Design, and from £75,000 for Blueprint, Design and Build. A design-only redesign of an existing app is the £30,000 tier. Across the wider market you will see anything from a few thousand pounds to several hundred thousand. A cheap redesign that has to be redone is the most expensive option there is. Our UK app design cost guide breaks those market ranges down band by band, including what a redesign on its own usually costs.
Where should we start?
With the free UX audit. We look at the app you already have and tell you what is costing you users, before anybody signs anything. If it turns out you do not need a redesign, that is the cheapest way to find out.
How long does an app redesign take?
It depends on how many screens and states the product has and how much of the structure changes. As a general guide, a Blueprint runs a few weeks and a design-only redesign of a mid-sized app takes a couple of months, with a staged rollout spreading the release over further weeks. We commit to a dated timeline at the end of the Blueprint.
Will a redesign hurt my existing users?
It can, if you do it badly. The failure mode is familiarity: people who had learned your app are forced to relearn it overnight, and some stop. That is why we stage the rollout, with a walkthrough of what moved and a way back for a defined period.
Do you redesign and rebuild, or just design?
Both, and we will tell you which you need. The Pro tier at £30,000 is design over your existing build. The Max tier from £75,000 covers design and development together, for when the code is the real constraint.
Can you work with our existing developers?
Yes, and it is common. We hand over a component library, specifications and a clickable prototype, then stay available through implementation, reviewing builds against the designs. Design thrown over the wall is how redesigns end up half-implemented.
What if we do not have design files or a design system?
Normal, and not a problem. We rebuild from the live app: screen inventory, states, edge cases, and the rules the product has been following whether or not anyone wrote them down. You finish with the design system you never had.
How do you measure whether the redesign worked?
We agree the measures before we start, during the Blueprint, and they come from the evidence stage rather than a wish list. Typically that means task completion rates, drop-off at the points where the old app lost people, retention at day one, seven and thirty, and support tickets about confusion. We take a baseline from the current app first, so if the numbers do not move that is a finding too.